In keeping with its client focused objectives, PNR has developed expertise in the design and installation of steel portal framed buildings.

Contracts to date have included both open (i.e. one side open for access) and closed buildings and relocation of existing steel framed buildings. Structures can be finished in block, brick or cladding and we can deliver all the associated infrastructure works and internal fit out works as necessary.

CASE STUDY: ACREWOOD WAY, ST.ALBANS – BUILD OF 3 STEEL PORTAL FRAME BUILDINGS PLUS REDEVELOPMENT OF WASTE TRANSFER FACILITY

Contract Value: £830,000 (total works including building)
Contract Duration: 29 weeks
Client: Veolia Environmental Services Ltd.

ACREWOOD_WAY-ST.ALBANS

PROJECT BRIEF:

PNR were appointed as principal contractor and designer to redevelop an existing operational site which had 3 redundant buildings.  This involved working closely with the client to minimise any disruption to their ongoing operational requirements.

WORKS:

PNR were responsible for the design, delivery and installation of all necessary works including (phased) demolition and rebuilding of 2 steel framed industrial buildings and relocation of a third steel framed building. This included new floor slabs, drainage, mechanical and electrical works, internal push walls and all associated works.