PNR started as a groundworks and civil engineering specialist in 2001 and has continued to build on that foundation whilst expanding its core competencies in other areas.

Today we offer a comprehensive service covering all aspects of this field including site excavation and stabilisation, foundations, slab formation, retaining walls, drainage and roadworks. We operate throughout the United Kingdom for both private companies and public bodies. We can deliver all sizes of contracts from small localised works to multi-million pound projects, including comprehensive design and build packages.

CASE STUDY: BELL ROAD, BASINGSTOKE – COMMERCIAL VEHICLE FACILITY DEVELOPMENT

Contract Value: £637,759
Contract Duration: 14 weeks
Client: Veolia Environmental Services Ltd

Bell_Road_Main_Image

PROJECT BRIEF:

PNR were instructed as principal designer and contractor on a scheme to convert a site previously occupied by a multi-story office and car park to a dedicated commercial vehicle facility. We had to adhere to a commercially critical timescale to ensure that the client could be operational by key dates.

WORKS:

PNR undertook all design works, existing slab demolition, removal of waste, formation of new slabs for HGV parking (using a combination of machine-laid concrete and traditional poured concrete) and modular office building. We then installed new drainage, wash bay, pedestrian walkways, lighting and security systems and all section 278 works at site entrance.

CASE STUDY: OXTON, NOTTINGHAMSHIRE – MAJOR UPGRADE TO EXISTING COMPOST FACILITY

Contract Value: £1,971,714
Contract Duration: 30 weeks
Client: Veolia Environmental Services Ltd.

Oxton_Nottinghamshire

PROJECT BRIEF:

PNR were awarded the contract for the design, supply, delivery and installation of major upgrading works to an existing composting facility. We worked in close liaison with the client’s nominated process equipment installer.

WORKS:

PNR undertook all groundworks and civils including bulk earthworks, landscaping bunds, new site access road, car parking, drainage, pushwalls, slabs, mechanical and engineering works, modular office and site security development.

CASE STUDY: PROLOGIS PARK, DUNSTABLE – PRE-CAST CONCRETE RETAINING WALL

Contract Value: £126,056
Contract Duration: 6 weeks
Client: Winvic Construction Ltd

PROJECT BRIEF:

PNR were sub-contracted to install a 220m-long and 5m-high retaining wall on a new distribution park within a short handover date.

WORKS:

PNR undertook the excavation for retaining wall foundation and installation of Legato blocks and associated drain and backfill to rear of block wall. Over 1,000 Legato blocks were installed in 10 days and the project was completed 2 weeks early.